500 N. 1000 W. Traffic Calming Improvements

Location: Salt Lake City, UT

Client: Salt Lake City

Duration: 2 months

Contract Value: $500K

Demolition of existing asphalt and curb/gutter, regrade and pour new floating islands with stamped red brick pattern to promote safer driving at this neighborhood intersection. Work also included converting existing rectangular storm drain lids and replacing with cast-in-place circular lids, additional signage and upgraded striping for bike lanes and crosswalks, concrete sidewalk and ADA ramp replacement.