Carver and Rural Sewer Lift Station
Location: Tempe, AZ
Client: City of Tempe
Duration: 15 months
Contract Value: $1 million
Installation of a bio-filter odor control system, carbon absorber, odor control system, magnesium hydroxide treatment system, ductwork, piping, valves, dampers, concrete masonry wall, site demolition, paving, landscaping, irrigation and electrical instrumentation. This project was in a residential area so it was necessary for CWC to control work related noise and odors emitting from the sewer lift station.