Castle Creek Bridge

Location: Moab, UT

Client: UDOT

Duration: 4 months

Contract Value: $1.3 million

Remove of existing bridge, installation of bypass culvert for river flows and construction of new steel girder and concrete bridge over Castle Creek. The project also included roadway excavation and asphalt paving.

Previous
Previous

Blanding City Water Tank

Next
Next

Wasatch Pacific Water Tank