Wasatch Pacific Water Tank

Location: Cottonwood Heights, UT

Client: Ralph Wadsworth Construction

Duration: 5 months

Contract Value: $1.3 million

Construction of a water tank for a residential development at the base of Big Cottonwood Canyon in Utah. Work included cast in place concrete, valve vault, and pump station with all associated piping.

Previous
Previous

Castle Creek Bridge

Next
Next

4100 South Street Widening