Wasatch Hollow Sidewalk Replacement
Location: Salt Lake City, UT
Client: Salt Lake City Corporation
Duration: September 2024 - Present
We have contracted with Salt Lake City to replace concrete sidewalks throughout Wasatch Hollow Park that were damaged by flooding as well as replace existing 4’ wide sidewalk to replace with 6’ wide to improve space for pedestrians and access for service vehicles in the park.


